Stages Steps Inwards Production Planning In Addition To Control

Stages Steps Inwards Production Planning In Addition To Control

Stages Steps Inwards Production Planning In Addition To Control

Steps inwards Production Planning in addition to Control


According to the British Standards Institute, at that spot are 4 stages, steps, techniques or essentials inwards the physical care for of blogspot.com//search?q=what-is-production-planning-meaning">production planning in addition to control.

Steps inwards Production Planning in addition to Control Stages Steps inwards Production Planning in addition to Control

The 4 stages or steps inwards production planning in addition to command are:

  1. Routing,
  2. Scheduling,
  3. Dispatching, and
  4. Follow-up.

Initial ii steps i.e. Routing in addition to Scheduling, relate to production planning.

Last ii steps i.e. Dispatching in addition to Follow-up, relate to production control.

Now let's proceed our intelligence farther to sympathise each stair inwards detail.


1. Routing


Routing is the kickoff stair inwards production planning in addition to control.

Routing tin last defined equally the physical care for of deciding the path (route) of function in addition to the sequence of operations.

Routing fixes inwards advance:

  1. The quantity in addition to character of the product.
  2. The men, machines, materials, etc. to last used.
  3. The type, number in addition to sequence of manufacturing operations, and
  4. The house of blogspot.com//search?q=what-is-production-planning-meaning">production.

In short, routing determines ‘What’, ‘How much’, ‘With which’, ‘How’ in addition to ‘Where’ to produce.

Routing may last either rattling uncomplicated or complex. This depends upon the nature of production. In a continuous production, it is automatic, i.e. it is rattling simple. However, inwards a labor order, it is rattling complex.

Routing is affected past times the human factor. Therefore, it should recognize human needs, desires in addition to expectations. It is also affected past times plant-layout, characteristics of the equipment, etc.

The principal objective of routing is to create upwards one's heed (fix) the best in addition to cheapest sequence of operations in addition to to ensure that this sequence is followed inwards the factory.

Routing gives a rattling systematic method of converting raw-materials into finished goods. It leads to smoothen in addition to efficient work. It leads to optimum utilization of resources; namely, men, machines, materials, etc. It leads to partitioning of labor. It ensures a continuous menses of materials without whatever backtracking. It saves fourth dimension in addition to space. It makes the function slow for the production engineers in addition to foremen. It has a smashing influence on pattern of factory's edifice in addition to installed machines.

So, routing is an of import stair inwards production planning in addition to control. Production planning starts amongst it.

Read article on blogspot.com//search?q=what-is-production-planning-meaning">procedure of routing inwards production.


2. Scheduling


Scheduling is the minute stair inwards production planning in addition to control. It comes afterwards routing.

Scheduling way to:

  1. Fix the amount of function to do.
  2. Arrange the unlike manufacturing operations inwards social club of priority.
  3. Fix the starting in addition to completing, appointment in addition to time, for each operation.

Scheduling is also done for materials, parts, machines, etc. So, it is similar a time-table of production. It is similar to the time-table, prepared past times the railways.

Time chemical constituent is given especial importance inwards scheduling. There are unlike types of schedules; namely, Master schedule, Operation schedule in addition to Daily schedule.

Scheduling helps to brand optimum purpose of time. It sees that each slice of function is started in addition to completed at a sure enough predetermined time. It helps to consummate the labor systematically in addition to inwards time. It brings fourth dimension blogspot.com//search?q=what-is-production-planning-meaning">coordination inwards production planning. All this helps to deliver the goods to the customers inwards time. It also eliminates the idle capacity. It keeps labor continuously employed.

So, scheduling is an of import stair inwards production planning in addition to control. It is essential inwards a factory, where many products are produced at the same time.


3. Dispatching


Dispatching is the 3rd stair inwards production planning in addition to control. It is the action, doing or implementation stage. It comes afterwards routing in addition to scheduling.

Dispatching way starting the physical care for of production. It provides the necessary potency to cause down the work. It is based on route-sheets in addition to schedule sheets.

Dispatching includes the following:

  1. Issue of materials, tools, fixtures, etc., which are necessary for actual production.
  2. Issue of orders, instructions, drawings, etc. for starting the work.
  3. Maintaining proper records of the starting in addition to completing each labor on time.
  4. Moving the function from 1 physical care for to approximately other equally per the schedule.
  5. Starting the command procedure.
  6. Recording the idle fourth dimension of machines.

Dispatching may last either centralized or decentralized:

  1. Under centralized dispatching, orders are issued direct past times a centralized authority.
  2. Under decentralized dispatching, orders are issued past times the concerned department.


4. Follow-up


Follow-up or Expediting is the terminal stair inwards production planning in addition to control. It is a controlling device. It is concerned amongst evaluation of the results.

Follow-up finds out in addition to removes the defects, delays, limitations, bottlenecks, loopholes, etc. inwards the production process. It measures the actual performance in addition to compares it to the expected performance. It maintains proper records of work, delays in addition to bottlenecks. Such records are used inwards hereafter to command production.

Follow-up is performed past times ‘Expediters’ or ‘Stock Chasers’.

Follow-up is necessary when production decreases fifty-fifty when at that spot is proper routing in addition to scheduling. Production may last disturbed due to break-downs of machinery, failure of power, shortage of materials, strikes, absenteeism, etc.

Follow-up removes these difficulties in addition to allows a smoothen production.